What is Scope of Work?

The bid/trade specific notes created for Subcontractors which are pulled into the Subcontractor’s Scope of Work section in their contract agreement, and are also pulled into the Owner’s Scope of Work Report and the Owner’s Contract. These notes can be edited or deleted if the GC does not want them to appear for the Owner.